Well-planned installation begins before the windows, doors or glass elements arrive on site.
Final measurements
Dimensions must be established after checking the actual site. If openings or finishes change after measuring, the team must be informed before production starts.
Preparing the area
The work area must be accessible and clear of objects that could obstruct installation. When replacing existing elements, nearby furniture and finishes should be protected.
Delivery access
Doors, glass panels and large elements may need a special delivery route. Check building access, stairs, lifts and the unloading area in advance.
Coordinating the work
On a construction site, installation must be coordinated with masonry, finishing, utility and interior works. Some tasks must be completed before installation, while others can only continue once the systems are fitted.
Final inspection
After installation, check positioning, opening and closing, surface condition and finishes around the work area.
Exact details vary from project to project and are agreed with the technical team before scheduling installation.
View the project stagesAll guides